Construction of a portable treatment plant ( skid) for animal and vegetable fats NEUTRALIZATION PLANT and transport to VOUROS facilities, Cyprus

Description

The project was implemented on behalf of ALFA LAVAL, and included:

  • Design and construction of metal construction (skid)
  • Supply of piping materials
  • Piping preparation and installation
  • Equipment installation
  • Sandblasting and paints
  • Insulation for piping and industrial equipment

The project was implemented in 2013, with a total cost of 97,800.00€