Description

The project was implemented on behalf of JET OIL CETRACORE, and included:

  • Tank bottom replacement
  • Floating ceiling repair
  • Installation of new wind girder
  • Installation of a new barrier for floating ceiling
  • Floating ceiling drain lines replacement
  • Replacement of foam generators, valves and mixers
  • Sandblasting – paint of bottom tank
  • Sandblasting – painting of interior and exterior of the floating ceiling
  • Sandblasting – shell paint

The project was implemented in 2019-2020 with a total cost of 763,000.00€