Cleaning, inspection and maintenance of TK-812,829,853 tanks at Industrial Area IONIA ELPE

Description
The project was implemented on behalf of ELPE. SA, and included:

  • Opening the tank and cleaning the tank bottom
  • Extraction of old and Installation of a new barrier for floating ceiling
  • Tank bottom sandblasting – paint
  • Sandblasting – painting of the outer part of the floating ceiling
  • Replacing the entire bottom of the tank (excluding the annular ring)
  • Tank insulation replacement work

The project was implemented in 2017-2018
With a total cost of 76,190.00€